IMPORTANT ANNOUNCEMENT

To our FLYPROJECT community,
 
On the 31st of December 2020, a member of our team shared that he tested positive for Covid after attending a dinner on 26th December 2020 where a known positive surfaced. Subsequently, all direct and indirect contacts with the individual from our team were sent for testing resulting in a further 8 team members testing positive. All 8 individuals were in close contact with a positive case and some were also at the same dinner. As a precautionary measure, we will be closing all FLYPROJECT studios until the 11th of January 2021, Monday. We are also sending the direct and indirect contacts with all positive cases as well as the rest of the team for testing in phases. We have submitted all information to the relevant authorities.
 
For ease of reference, please refer to the following a summary sequence of events. Below are the series of events that occurred.
 
On 31st Dec 2020, 1 of our team members notified us that he tested positive after attending a dinner on 26th December 2020, where a fellow attendee tested positive on 30th December 2020. This led us to send all known contacts and others who attended the dinner to be tested.
 
We have completed the first phase of mass testing on 1st January 2021 and have just got confirmation that 8 out of 51 team members tested positive. All 8 individuals were in close contact with a positive case and some were also at the same dinner. The individuals worked at the following locations since 24th December: Intermark Mall, DC Mall, Verve Shops, Kiara 163, JWM and The Curve.
 
When positive cases were informed and confirmed by the Ministry of Health Malaysia (MOH), the team took immediate action to close all outlets for thorough sanitation and disinfection. We will also remain closed for 10 days to allow all team members to quarantine for 10 days based on the incubation period. All cases that were tested positive have been in isolation since 1st January 2021. We wish to reiterate that we will be testing all team members and sanitising all outlets thoroughly before reopening. We are closing all outlets during this period as a safety precaution to the public.

TIMELINE

2 JANUARY 2021

 CASE A 

Case A was last seen at the FLYPROJECT premise on the following dates and times:

 

 THURSDAY, 24 DECEMBER 2020 

  • Arrived at Kiara 163 at 6.30 AM, conducted classes from 6.45 AM - 10.00 AM and then left the premises.

  • Arrived at Intermark Mall at 4.00 PM, conducted classes from 5.00 PM - 10.00 PM and then left the premises.

 

 FRIDAY, 25 DECEMBER 2020 

  • Arrived at Kiara 163 at 8.30 AM, conducted classes from 9.00 AM - 4.00 PM and then left the premises.

 

 SATURDAY, 26 DECEMBER 2020 

  • Arrived at Intermark Mall at 3.00 PM, joined a class scheduled for 2.00 PM and then left the premises at 3.30 PM.

 

 WEDNESDAY, 30 DECEMBER 2020 

  • Arrived at DC Mall at 10.30 AM, conduct a class scheduled at 4.00 PM and then left the premise.

  • Case A went to get tested after losing sense of smell and taste.

 

 THURSDAY, 31 DECEMBER 2020 

  • Case A informed FLYPROJECT management after receiving test result and confirmed positive.

 CASE B 

Case B was last seen at the FLYPROJECT Intermark premise on the 26th December 2020

 

 SATURDAY, 26 DECEMBER 2020 

  • Arrived at Intermark Mall at approximately 1.15 PM. Conducted the FLYCYCLE class scheduled for 2.00 PM and then left the premises at 3.30 PM together with Case A.

 

 WEDNESDAY, 30 DECEMBER 2020 

  • Case B went to get tested after showing symptoms.

 

 THURSDAY, 31 DECEMBER 2020 

  • Case B informed FLYPROJECT management after receiving test result and confirmed positive.

 CASE c 

Case C was last seen at the FLYPROJECT Intermark premise on the 29th December 2020.

 

 SATURDAY, 26 DECEMBER 2020 

  • Case C was in the same premise with Case A outside of FLYPROJECT.

 

 SUNDAY, 27 DECEMBER 2020 

  • Case C had conducted the FLYCLIMB class at FLYCLIMB JWM at 10.30 AM.

 TUESDAY, 29 DECEMBER 2020 

  • Case C had conducted the FLYCYCLE class at FLYPROJECT INTERMARK MALL 8.00 PM.

 

 THURSDAY, 31 DECEMBER 2020 

  • FLYPROJECT management was notified of Case A.

 

 FRIDAY, 1 JANUARY 2021 

  • FLYPROJECT management sent the team for a mass testing.

 

 SATURDAY, 2 JANUARY 2021 

  • Case C informed FLYPROJECT management after receiving test result and confirmed positive.

  • Case C has not been in the studio since his last class on the 29th of December 2020.

 CASE D 

Case D was last seen at the FLYPROJECT DC MALL premise on the 30th December 2020

 

 SATURDAY, 26 DECEMBER 2020 

  • Case D was in the same premise with Case A outside of FLYPROJECT.

 

 WEDNESDAY, 30 DECEMBER 2020 

  • Case D had conducted the FLYFIGHT class at 8.45 PM.

 

 THURSDAY, 31 DECEMBER 2020 

  • FLYPROJECT management was notified of Case A.

 

 FRIDAY, 1 JANUARY 2021 

  • FLYPROJECT management sent the team for a mass testing.

 

 SATURDAY, 2 JANUARY 2021 

  • Case D informed FLYPROJECT management after receiving test result and confirmed positive.

  • Case D has not been in the studio since his last class on the 30th of December 2020.

 CASE E 

Case E was last seen at the FLYPROJECT CURVE premise on the 30th December 2020

 

 SATURDAY, 26 DECEMBER 2020 

  • Case E was in the same premise with Case A outside of FLYPROJECT.

 

 SUNDAY, 27 DECEMBER 2020 

  • Arrived at FLYPROJECT VERVE SHOPS to conduct a FLYCYCLE class scheduled at 10.45 AM. Left the premises after the class ended half an hour later.

 

 TUESDAY, 29 DECEMBER 2020 

  • Arrived at FLYPROJECT VERVE SHOPS to conduct a FLYCYCLE class scheduled at 8.30 PM. Left the premises after the class ended half an hour later.

 

 WEDNESDAY, 30 DECEMBER 2020 

  • Case E arrived in the studio around 5pm and conducted a class scheduled for 6.00 PM.

 

 THURSDAY, 31 DECEMBER 2020 

  • FLYPROJECT management was notified of Case A.

 FRIDAY, 1 JANUARY 2021 

  • FLYPROJECT management sent the team for a mass testing.

 SATURDAY, 2 JANUARY 2021 

  • Case E informed FLYPROJECT management after receiving test result and confirmed positive.

  • Case E has not been in the studio since her last class on the 30th of December 2020.

 CASE F 

Case F was last seen at the FLYPROJECT INTERMARK MALL premise on the 30th December 2020

 

 SUNDAY, 27 DECEMBER 2020 

  • Case F had conducted the FLYCIRCUIT class from 8.00 AM - 5.00 PM.

 

 MONDAY, 28 DECEMBER 2020 

  • Case F had conducted the FLYCIRCUIT class.

 

 TUESDAY, 29 DECEMBER 2020 

  • Case F had conducted the FLYCIRCUIT class.

 

 WEDNESDAY, 30 DECEMBER 2020 

  • Case F had conducted the FLYCIRCUIT class.

 

 THURSDAY, 31 DECEMBER 2020 

  • FLYPROJECT management was notified of Case A

 

 FRIDAY, 1 JANUARY 2021 

  • FLYPROJECT management sent the team for a mass testing.

 

 SATURDAY, 2 JANUARY 2021 

  • Case F informed FLYPROJECT management after receiving test result and confirmed positive.

  • Case F has not been in the studio since her last class on the 30th of December 2020.

 CASE G 

Case G was last seen at the FLYPROJECT CURVE premise on the 30th December 2020

 

 SATURDAY, 26 DECEMBER 2020 

  • Case G was in the same premise with Case A outside of FLYPROJECT.

 

 WEDNESDAY, 30 DECEMBER 2020 

  • Case G came in for a shift at 2pm and left right after the shift ended at 10.00 PM.

 THURSDAY, 31 DECEMBER 2020 

  • FLYPROJECT management was notified of Case A

 

 FRIDAY, 1 JANUARY 2021 

  • FLYPROJECT management sent the team for a mass testing.

 

 SATURDAY, 2 JANUARY 2021 

  • Case G informed FLYPROJECT management after receiving test result and confirmed positive.

  • Case G has not been in the studio since his last class on the 30th of December 2020.

 CASE H 

Case H was last seen at the FLYPROJECT DC MALL premise on the 30th December 2020.

 

 SATURDAY, 26 DECEMBER 2020 

  • Case H was in the same premise with Case A outside of FLYPROJECT.

 

 TUESDAY, 29 DECEMBER 2020  

  • Case H came in for a shift at 8.30am and left right after the shift ended at 3.00 PM.

 

 THURSDAY, 31 DECEMBER 2020 

  • FLYPROJECT management was notified of Case A

 

 FRIDAY, 1 JANUARY 2021 

  • FLYPROJECT management sent the team for a mass testing.

 

 SATURDAY, 2 JANUARY 2021 

  • Case H informed FLYPROJECT management after receiving test result and confirmed positive.

  • Case H has not been in the studio since his last class on the 30th of December 2020.

 CASE I 

Case I was last seen at the FLYPROJECT VERVE SHOPS premise on the 30th December 2020

 

 SATURDAY, 26 DECEMBER 2020 

  • Case I was in the same premise with Case A outside of FLYPROJECT .

 

 TUESDAY, 29 DECEMBER 2020 

  • Case I came in for a shift at FLYPROJECT DC MALL at 8.30 AM and left right after the shift ended at 3.00 PM then headed to FLYPROJECT VERVE SHOPS between 7.00 PM - 8.30 PM.

 

 THURSDAY, 31 DECEMBER 2020 

  • FLYPROJECT management was notified of Case A

 

 FRIDAY, 1 JANUARY 2021 

  • FLYPROJECT management sent the team for a mass testing.

 

 SATURDAY, 2 JANUARY 2021 

  • Case I informed FLYPROJECT management after receiving test result and confirmed positive.

  • Case I has not been in the studio since her last class on the 29th of December 2020.

 CASE J 

Case J was last seen at the FLYPROJECT DC MALL premise on the 27th December 2020.

 

 SATURDAY, 26 DECEMBER 2020 

  • Case J was in the same premise with Case A outside of FLYPROJECT.

 

 SUNDAY, 27 DECEMBER 2020 

  • Case J came in for a shift at FLYPROJECT DC MALL at 9.00 AM and left after her shift ended 5.30 PM.

 

 THURSDAY, 31 DECEMBER 2020 

  • FLYPROJECT management was notified of Case A

 

 FRIDAY, 1 JANUARY 2021 

  • FLYPROJECT management sent the team for a mass testing.

 

 SATURDAY, 2 JANUARY 2021 

  • Case J informed FLYPROJECT management after receiving test result and confirmed positive.

  • Case J has not been in the studio since her last class on the 27th of December 2020.

 CASE k 

Case K was last seen at the FLYPROJECT INTERMARK MALL premise on the 29th December 2020

 

 TUESDAY, 29 DECEMBER 2020 

  • Case K came in for a shift at FLYPROJECT INTERMARK MALL at 4.00 PM and left after his shift ended 10.00 PM.

 

 THURSDAY, 31 DECEMBER 2020 

  • FLYPROJECT management was notified of Case A

 

 FRIDAY, 1 JANUARY 2021 

  • FLYPROJECT management sent the team for a mass testing.

 

 SATURDAY, 2 JANUARY 2021 

  • Case K informed FLYPROJECT management after receiving test result and confirmed positive.

  • Case K has not been in the studio since his last class on the 27th of December 2020.

 CASE l 

 SATURDAY, 26 DECEMBER 2020 

  • Arrived at FLYPROJECT INTERMARK MALL at 9.15 AM for a class conducted by Case C at 9.30 AM. Left the FLYPROJECT premises together with Case C to a premise where Case A was in the same space.

 SUNDAY, 27 DECEMBER 2020 

  • Arrived at FLYPROJECT JWM at 10.16 AM for a class conducted by Case C at 10.30 AM. Left the premises at 12.00 PM.

 

 TUESDAY, 29 DECEMBER 2020 

  • Arrived at FLYPROJECT INTERMARK MALL at 7.38 PM for a class conducted by Case C at 8.00 PM. Left the premises at 9.00 PM.

 

 THURSDAY, 31 DECEMBER 2020 

  • Initiated to get tested when she found out she was in the same premise as Case A outside of FLYPROJECT.

 FRIDAY, 1 JANUARY 2021 

  • Received results of positive testing.

 

 SATURDAY, 2 JANUARY 2021 

  • Case L informed FLYPROJECT management after receiving test result and confirmed positive.

  • Case L has not been in the studio since her class on the 29th December 2020.

4 JANUARY 2021

 CASE M 

 SUNDAY, 27 DECEMBER 2020 

  • Arrived at FLYPROJECT VERVE SHOPS at 10.30 AM for a class conducted by case E. Left the premises after the class ended half an hour later.

 TUESDAY, 29 DECEMBER 2020 

  • Arrived at FLYPROJECT DC MALL at approximately 6.00 PM and left 30 minutes later as she switched her class from FLYPROJECT DC MALL to FLYPROJECT VERVE SHOPS.

  • Left FLYPROJECT DC MALL and headed to FLYPROJECT VERVE SHOPS at 7.00 PM for a 8.30 PM class conducted by case E. Left the premises after the class ended.

 

 SATURDAY, 2 JANUARY 2021 

  • Received an email from FLYPROJECT with regards to being in direct contact with case E which led her to get herself tested.

 

 SUNDAY, 3 JANUARY 2021 

  • Case M informed FLYPROJECT management after receiving test result and confirmed positive.

  • Case M has not been in the studio since her class on the 29th December 2020.

 CASE N 

 SUNDAY, 27 DECEMBER 2020 

  • Arrived at FLYPROJECT JWM at 10.22 AM for a class conducted by Case C. Took a shower at the facilities and left the building together with Case C for lunch.

 TUESDAY, 29 DECEMBER 2020 

  • Arrived at FLYPROJECT INTERMARK MALL at approximately 7.41 PM to attend a class conducted by case C scheduled for 8.00 PM. Left the premises at 9.00 AM after class.

 

 SATURDAY, 2 JANUARY 2021 

  • Received an email from FLYPROJECT with regards to being in direct contact with case C which led her to get herself tested.

 

 SUNDAY, 3 JANUARY 2021 

  • Case N informed FLYPROJECT management after receiving test result and confirmed positive.

  • Case N has not been in the studio since her class on the 29th December 2020.

 CASE O 

 TUESDAY, 29 DECEMBER 2020 

  • Arrived at FLYPROJECT INTERMARK MALL at approximately 7.47 PM to attend a class conducted by case C scheduled for 8pm. Left the premises after class at about 9.00 PM.

 SATURDAY, 2 JANUARY 2021 

  • Received an email from FLYPROJECT with regards to being in direct contact with case C which led her to get herself tested.

 

 SUNDAY, 3 JANUARY 2021 

  • Case O informed FLYPROJECT management after receiving test result and confirmed positive.

  • Case O has not been in the studio since her class on the 29th December 2020.

 CASE P 

 TUESDAY, 29 DECEMBER 2020 

  • Arrived at FLYPROJECT INTERMARK MALL at approximately 7.20 PM to attend a class conducted by Case C scheduled for 8.00 PM. Left the premises after class at about 9.10 PM.

 WEDNESDAY, 30 DECEMBER 2020 

  • Arrived at FLYPROJECT INTERMARK MALL at approximately 7.33 PM to attend a class conducted by Case U scheduled for 8.00 PM. Left the premises after class at about 9.00 PM.

 SATURDAY, 2 JANUARY 2021 

  • Received an email from FLYPROJECT with regards to being in direct contact with case C which led her to get herself tested.

 SUNDAY, 3 JANUARY 2021 

  • Case P informed FLYPROJECT management after receiving test result and confirmed positive.

  • Case P has not been in the studio since her class on the 30th December 2020.

 CASE Q 

 TUESDAY, 29 DECEMBER 2020 

  • Arrived at FLYPROJECT INTERMARK MALL at approximately 7.50 PM to attend a Flycycle class conducted by Case C scheduled for 8.00 PM. Left the premises after class at about 9.00 PM.

 SATURDAY, 2 JANUARY 2021 

  • Received an email from FLYPROJECT with regards to being in direct contact with case C which led her to get herself tested.

 SUNDAY, 3 JANUARY 2021 

  • Case Q informed FLYPROJECT management after receiving test result and confirmed positive.

  • Case Q has not been in the studio since her class on the 29th December 2020.

 CASE R 

 TUESDAY, 29 DECEMBER 2020 

  • Arrived at FLYPROJECT INTERMARK MALL at approximately 7.00 PM to attend a class conducted by Case C scheduled for 8.00 PM. Left the premises after class at about 9pm and then left the mall at 10.00 PM.

 SATURDAY, 2 JANUARY 2021 

  • Received an email from FLYPROJECT with regards to being in direct contact with Case C which led her to get herself tested.

 SUNDAY, 3 JANUARY 2021 

  • Case R informed FLYPROJECT management after receiving test result and confirmed positive.

  • Case R has not been in the studio since her class on the 29th December 2020.

 CASE S 

Case S was last seen at the FLYPROJECT MAHSA premise on the 31st December 2020.

 SATURDAY, 26 DECEMBER 2020 

  • Case S was in the same premise with Case C and D outside of FLYPROJECT.

 THURSDAY, 31 DECEMBER 2020 

  • Case S went to FLYPROJECT MAHSA at 4.30 PM for training.

 SATURDAY, 2 JANUARY 2021 

  • Received an email from FLYPROJECT with regards to being in direct contact with Case C and D which led her to get herself tested.

 SUNDAY, 3 JANUARY 2021 

  • Case S informed FLYPROJECT management after receiving test result and confirmed positive.

  • Case S has not been in the studio since her class on the 31st December 2020.

 CASE T 

 SATURDAY, 26 DECEMBER 2020 

  • Case T arrived in the FLYPROJECT VERVE SHOPS around 11.40 AM and conducted a class scheduled for 12.00 PM and left around 2.00 PM.

 SUNDAY, 27 DECEMBER 2020 

  • Case T arrived in the FLYPROJECT INTERMARK MALL around 11.40 AM and conducted a class scheduled for 12.00 PM and left around 2.00 PM.

 THURSDAY, 31 DECEMBER 2020 

  • Case T arrived in the FLYPROJECT DC Mall around 5.40 PM and conducted a class scheduled for 5.50 PM and left around 7.30 PM.

  • FLYPROJECT management was notified of Case A.

 SUNDAY, 3 JANUARY 2021 

  • FLYPROJECT management sent the team for a mass testing.

 MONDAY, 4 JANUARY 2021 

  • Case T informed FLYPROJECT management after receiving test result and confirmed positive.

  • Case T has not been in the studio since his last class on the 31st of December 2020.

 CASE U 

 SATURDAY, 26 DECEMBER 2020 

  • Case U arrived in the FLYPROJECT MANDARIN ORIENTAL conducted a class scheduled for 2.00 PM and left premise after the class.

 SUNDAY, 27 DECEMBER 2020 

  • Case U arrived in the FLYPROJECT VERVE SHOPS conducted a class scheduled for 2.00 PM and left premise after the class.

 MONDAY, 28 DECEMBER 2020 

  • Case U arrived in the FLYPROJECT INTERMARK MALL conducted a Flycycle class scheduled for 6.55 PM and left premise after the class

 TUESDAY, 29 DECEMBER 2020 

  • Case U arrived in the FLYPROJECT MAHSA around 7.30 PM and conducted a class scheduled for 8.00 PM and left around 9.00 PM.

 WEDNESDAY, 30 DECEMBER 2020 

  • Case U arrived in the FLYPROJECT INTERMARK MALL around 5.52 PM and conducted Flycycle classes scheduled for 5.50 PM and 8.00 PM and left around 9.00 PM.

 THURSDAY, 31 DECEMBER 2020 

  • Case U arrived in the FLYPROJECT INTERMARK MALL around 6.20 PM and conducted Flycycle classes scheduled for 6.55 PM and left around 8.00 PM.

  • FLYPROJECT management was notified of Case A.

 SUNDAY, 3 JANUARY 2021 

  • FLYPROJECT management sent the team for a mass testing.

 MONDAY, 4 JANUARY 2021 

  • Case U informed FLYPROJECT management after receiving test result and confirmed positive.

  • Case U has not been in the studio since her last class on the 31st of December 2020.

 CASE V 

Case V was in contact with Case F outside of FLYPROJECT premises.

 SATURDAY, 26 DECEMBER 2020 

  • Case V arrived in the FLYPROJECT KIARA 163 conducted classes scheduled for 8.00 AM, 10.00 AM, 12.00 PM, 2.00 PM and 4.00 PM left premise after the class.

 MONDAY, 28 DECEMBER 2020 

  • Case V arrived in the FLYPROJECT KIARA 163 conducted classes scheduled for 6.45 AM and 8.35 AM left premise after the class.

 WEDNESDAY, 30 DECEMBER 2020 

  • Case V arrived in the FLYPROJECT INTERMARK MALL conducted Flycircuit classes scheduled for 7.40 AM and 9.35 AM left premise after the class.

 THURSDAY, 31 DECEMBER 2020 

  • FLYPROJECT management was notified of Case A.

 SUNDAY, 3 JANUARY 2021 

  • FLYPROJECT management sent the team for a mass testing.

 MONDAY, 4 JANUARY 2021 

  • Case V informed FLYPROJECT management after receiving test result and confirmed positive.

  • Case V has not been in the studio since his last class on the 30th of December 2020.

 CASE W 

 TUESDAY, 29 DECEMBER 2020 

  • Arrived at FLYPROJECT INTERMARK MALL to attend a class conducted by Case C scheduled for 8.00 PM.

 FRIDAY, 1 JANUARY 2021 

  • Informed by a friend regards to being in direct contact with Case C which led her to get herself tested.

 MONDAY, 4 JANUARY 2021 

  • Case W informed FLYPROJECT management after receiving test result and confirmed positive.

  • Case W has not been in the studio since her class on the 29th December 2020.

 CASE X 

 THURSDAY, 24 DECEMBER 2020 

  • Arrived at FLYPROJECT INTERMARK MALL to attend a class conducted by Coach 1 (tested negative during mass team testing) scheduled for 8.00 PM.

 MONDAY, 28 DECEMBER 2020 

  • Arrived at FLYPROJECT KIARA 163 to attend a class conducted by Coach 2 (tested negative during mass team testing) scheduled for 8.00 PM.

 FRIDAY, 1 JANUARY 2021 

  • Went to get tested after she saw the announcement.

 MONDAY, 4 JANUARY 2021 

  • Case X informed FLYPROJECT management after receiving test result and confirmed positive.

  • Case X has not been in the studio since her class on the 28th December 2020.

6 JANUARY 2021

 CASE Y 

 THURSDAY, 27 DECEMBER 2020 

  • Arrived at FLYPROJECT INTERMARK MALL for a class conducted by Case T at 12.00 PM and left the premise after the class.

 MONDAY, 4 JANUARY 2021 

  • Received an email from FLYPROJECT with regards to being in direct contact with Case T which led him to get himself tested.

 WEDNESDAY, 6 JANUARY 2021 

  • Case Y informed FLYPROJECT management after receiving test results and confirmed positive.

  • Case Y has not been in the studio since his class on 27th December 2020.

 CASE Z 

 TUESDAY, 29 DECEMBER 2020 

  • Arrived at FLYPROJECT INTERMARK MALL at 7:45 PM for a Flycycle class conducted by Case C at 8.00 PM and left the premise around 9.15 PM.

 SATURDAY, 2 JANUARY 2021 

  • Received an email from FLYPROJECT with regards to being in direct contact with Case C which led her to get herself tested.

 THURSDAY, 5 JANUARY 2021 

  • Case Z informed FLYPROJECT management after receiving test results and confirmed positive.

  • Case Z has not been in the studio since her class on 29th December 2020.

 CASE AA 

 TUESDAY, 29 DECEMBER 2020 

  • Arrived at FLYPROJECT INTERMARK MALL for a Flycycle class conducted by Case C at 8.00 PM and left the premise after the class.

 SATURDAY, 2 JANUARY 2021 

  • Received an email from FLYPROJECT with regards to being in direct contact with Case C which led her to get herself tested.

 THURSDAY, 5 JANUARY 2021 

  • Case AA informed FLYPROJECT management after receiving test results and confirmed positive

  • Case AA has not been in the studio since her class on 29th December 2020.

 CASE AB 

 SATURDAY, 26 DECEMBER 2020 

  • Arrived at FLYPROJECT VERVE SHOPS for a class conducted by Case T at 12.00 PM and left the premise after the class.

 SUNDAY, 27 DECEMBER 2020 

  • Arrived at FLYPROJECT DC MALL for a Flycycle class conducted by Coach 7 (tested negative during mass team testing) at 10:45 AM and left the premise after the class.

 MONDAY, 28 DECEMBER 2020 

  • Arrived at FLYPROJECT DC MALL for a Flycycle class conducted by Coach 8 (tested negative during mass team testing) at 6:55 PM and left the premise after the class.

 THURSDAY, 31 DECEMBER 2020 

  • Arrived at FLYPROJECT DC MALL for a class conducted by Case T at 5:50 PM and left the premise after the class.

 MONDAY, 4 JANUARY 2021 

  • Received an email from FLYPROJECT with regards to being in direct contact with Case T which led her to get herself tested.

 WEDNESDAY, 6 JANUARY 2021 

  • Case AB informed FLYPROJECT management after receiving test results and confirmed positive.

  • Case AB has not been in the studio since her class on 31st December 2020.

 CASE AC 

 TUESDAY, 29 DECEMBER 2020 

  • Arrived at FLYPROJECT VERVE SHOPS for a class conducted by Case E at 8.00 PM and left the premise after the class.

 WEDNESDAY, 30 DECEMBER 2020 

  • Arrived at FLYPROJECT INTERMARK MALL for a Flycircuit class conducted by Case F at 12.00 PM and left the premise after the class.

 SATURDAY, 2 JANUARY 2021 

  • Received an email from FLYPROJECT with regards to being in direct contact with Case E & F which led her to get herself tested.

 WEDNESDAY, 6 JANUARY 2021 

  • Case AC informed FLYPROJECT management after receiving test results and confirmed positive.

  • Case AC has not been in the studio since her class on 30th December 2020.

 CASE AD 

 TUESDAY, 29 DECEMBER 2020 

  • Arrived at FLYPROJECT INTERMARK MALL for a Flycycle class conducted by Case C at 8.00 PM and left the premise after the class.

 SATURDAY, 2 JANUARY 2021 

  • Received an email from FLYPROJECT with regards to being in direct contact with Case C which led her to get herself tested.

 WEDNESDAY, 6 JANUARY 2021 

  • Case AD informed FLYPROJECT management after receiving test results and confirmed positive.

  • Case AD has not been in the studio since her class on 29th December 2020.

 CASE AE 

 FRIDAY, 25 DECEMBER 2020 

  • Arrived at FLYPROJECT INTERMARK MALL for a Flycircuit class conducted by Case F at 4.00 PM and left the premise after the class.

 SUNDAY, 27 DECEMBER 2020 

  • Arrived at FLYPROJECT INTERMARK MALL for a Flycircuit class conducted by Case F at 12.00 PM and left the premise after the class.

 MONDAY, 28 DECEMBER 2020 

  • Arrived at FLYPROJECT INTERMARK MALL for a Flycircuit class conducted by Case AT at 8.35 AM and left the premise after the class.

 TUESDAY, 29 DECEMBER 2020 

  • Arrived at FLYPROJECT INTERMARK MALL for a Flycircuit class conducted by Case AT at 8.35 AM and left the premise after the class.

 WEDNESDAY, 30 DECEMBER 2020 

  • Arrived at FLYPROJECT INTERMARK MALL for a Flycircuit class conducted by Case V at 9.35 AM and left the premise after the class.

 THURSDAY, 31 DECEMBER 2020 

  • Arrived at FLYPROJECT INTERMARK MALL for a Flycircuit class conducted by Coach 4 (tested negative during mass team testing) at 9.35 AM and left the premise after the class.

 SATURDAY, 2 JANUARY 2021 

  • Received an email from FLYPROJECT with regards to being in direct contact with Case F which led her to get herself tested.

 TUESDAY, 5 JANUARY 2021 

  • Case AE informed FLYPROJECT management after receiving test results and confirmed positive.

  • Case AE has not been in the studio since her class on 31st December 2020.

 CASE AF 

SUNDAY, 27 DECEMBER 2020 

  • Arrived at FLYPROJECT INTERMARK MALL for a Flycycle class conducted by Case T at 12.00 PM and left the premise after the class.

 WEDNESDAY, 30 DECEMBER 2020 

  • Arrived at FLYPROJECT MAHSA for a class conducted by Coach 9 (tested negative during mass team testing) at 6.55 PM and left the premise after the class.

 MONDAY, 4 JANUARY 2021 

  • Received an email from FLYPROJECT with regards to being in direct contact with Case T which led her to get himself tested.

  WEDNESDAY, 6 JANUARY 2021 

  • Case AF informed FLYPROJECT management after receiving test results and confirmed positive.

  • Case AF has not been in the studio since his class on 30th December 2020.

 CASE AG 

 SUNDAY, 27 DECEMBER 2020 

  • Arrived at FLYPROJECT INTERMARK MALL for a Flycycle class conducted by Case T at 12.00 PM and left the premise after the class.

 WEDNESDAY, 30 DECEMBER 2020 

  • Arrived at FLYPROJECT MAHSA for a class conducted by Coach 9 (tested negative during mass team testing) at 6.55 PM and left the premise after the class.

 MONDAY, 4 JANUARY 2021 

  • Received an email from FLYPROJECT with regards to being in direct contact with Case T which led her to get herself tested.

  WEDNESDAY, 6 JANUARY 2021 

  • Case AG informed FLYPROJECT management after receiving test results and confirmed positive.

  • Case AG has not been in the studio since her class on 30th December 2020.

 CASE AH 

 MONDAY, 28 DECEMBER 2020 

  • Arrived at FLYPROJECT DC MALL at 2.00 PM to 5.30 PM for internal training.

 TUESDAY, 29 DECEMBER 2020 

  • Arrived at FLYPROJECT DC MALL for a Flycycle class conducted by Coach 12 (tested negative during mass team testing) at 5.50 PM and left the premise around 7.00 PM.

 WEDNESDAY, 30 DECEMBER 2020 

  • Arrived at FLYPROJECT DC MALL at 2.00 PM to 5.30 PM for internal training.

 THURSDAY, 31 DECEMBER 2020 

  • Arrived at FLYPROJECT DC MALL at 2.00 PM to 5.30 PM for internal training.

 MONDAY, 4 JANUARY 2021 

  • Went to get tested after the announcement.

  WEDNESDAY, 6 JANUARY 2021 

  • Case AH informed FLYPROJECT management after receiving test results and confirmed positive.

  • Case AH has not been in the studio since 31st December 2020.

 CASE AI 

 WEDNESDAY, 30 DECEMBER 2020 

  • Arrived at FLYPROJECT INTERMARK MALL at 5.25 PM for a Flycycle class conducted by Case U at 6.00 PM and left the premise around 7.00 PM.

 MONDAY, 4 JANUARY 2021 

  • Received an email from FLYPROJECT with regards to being in direct contact with Case U which led her to get herself tested.

  WEDNESDAY, 6 JANUARY 2021 

  • Case AI informed FLYPROJECT management after receiving test results and confirmed positive.

  • Case AI has not been in the studio since her class on 30th December 2020.

 CASE AJ 

 SATURDAY, 26 DECEMBER 2020 

  • Arrived at FLYPROJECT INTERMARK MALL at 1.30 PM for a Flycycle class conducted by Case B at 2.00 PM and left the premise after the class.

 TUESDAY, 29 DECEMBER 2020 

  • Arrived at FLYPROJECT INTERMARK MALL at 7.30 PM for a Flycycle class conducted by Case C at 8.00 PM and left the premise with Case C and friends for dinner.

 THURSDAY, 31 DECEMBER 2020 

  • Started showing symptoms.

 SATURDAY, 2 JANUARY 2021 

  • Received an email from FLYPROJECT with regards to being in direct contact with Case B which led her to get herself tested.

  TUESDAY, 5 JANUARY 2021 

  • Case AJ informed FLYPROJECT management after receiving test results and confirmed positive.

  • Case AJ has not been in the studio since her class on 29th December 2020.

 CASE AK 

 TUESDAY, 29 DECEMBER 2020 

  • Arrived at FLYPROJECT INTERMARK MALL at 7.45 PM for a Flycycle class conducted by Case C at 8.00 PM and left the premise after the class.

 THURSDAY, 31 DECEMBER 2020 

  • Arrived at FLYPROJECT INTERMARK MALL at 12.15 PM for a Flycircuit class conducted by Coach 4 (tested negative during mass team testing) at 12.25 PM and left the premise after the class.

 SATURDAY, 2 JANUARY 2021 

  • Received an email from FLYPROJECT with regards to being in direct contact with Case C which led her to get herself tested.

  TUESDAY, 5 JANUARY 2021 

  • Case AK informed FLYPROJECT management after receiving test results and confirmed positive.

  • Case AK has not been in the studio since her class on 31st December 2020.

 CASE AL 

 FRIDAY, 25 DECEMBER 2020 

  • Arrived at FLYPROJECT VERVE SHOPS at 9.15 AM for a Flycycle class conducted by Coach 5 (tested negative during mass team testing) at 9.30 AM and left the premise after the class.

 WEDNESDAY, 30 DECEMBER 2020 

  • Arrived at FLYPROJECT VERVE SHOPS at 7.45 PM for a Flycycle class conducted by Coach 5 (tested negative during mass team testing) at 8.00 PM and left the premise after the class.

 THURSDAY, 31 DECEMBER 2020 

  • Arrived at FLYPROJECT DC MALL at 5.35 PM for a Flycycle class conducted by Case T at 5.50 PM and left the premise after the class.

 MONDAY, 4 JANUARY 2021 

  • Received an email from FLYPROJECT with regards to being in direct contact with Case T which led her to get herself tested.

  WEDNESDAY, 6 JANUARY 2021 

  • Case AL informed FLYPROJECT management after receiving test results and confirmed positive.

  • Case AL has not been in the studio since her class on 31st December 2020.

 CASE AM 

 THURSDAY, 31 DECEMBER 2020 

  • Arrived at FLYPROJECT DC MALL for a Flycycle class conducted by Case T at 5:50pm and left the premise around 6.50 PM.

 MONDAY, 4 JANUARY 2021 

  • Received an email from FLYPROJECT with regards to being in direct contact with Case T which led her to get herself tested.

  WEDNESDAY, 6 JANUARY 2021 

  • Case AM informed FLYPROJECT management after receiving test results and confirmed positive.

  • Case AM has not been in the studio since her class on 31st December 2020.

 CASE AN 

 THURSDAY, 31 DECEMBER 2020 

  • Case AN went for a class at 8.30 AM at Studio A.

  • Arrived at FLYPROJECT INTERMARK MALL at around 12.53 PM for a Flycircuit class conducted by Coach 6 (tested negative during mass team testing) at 1.20 PM and left the premise around 2.45 PM.

 MONDAY, 4 JANUARY 2021 

  • Was notified by Studio A with regards to being in direct contact with a positive case which led him to get himself tested.

  WEDNESDAY, 6 JANUARY